Sign In | Join Free | My himfr.com
Home > Steel Structure Fabrication >

Industrial Steel Structure Fabrication Prefabricated Portal Steel Structure

Qingdao Ruly Steel Engineering Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Industrial Steel Structure Fabrication Prefabricated Portal Steel Structure from wholesalers
     
    Buy cheap Industrial Steel Structure Fabrication Prefabricated Portal Steel Structure from wholesalers
    • Buy cheap Industrial Steel Structure Fabrication Prefabricated Portal Steel Structure from wholesalers
    • Buy cheap Industrial Steel Structure Fabrication Prefabricated Portal Steel Structure from wholesalers
    • Buy cheap Industrial Steel Structure Fabrication Prefabricated Portal Steel Structure from wholesalers
    • Buy cheap Industrial Steel Structure Fabrication Prefabricated Portal Steel Structure from wholesalers

    Industrial Steel Structure Fabrication Prefabricated Portal Steel Structure

    Ask Lasest Price
    Brand Name : Ruly Steel
    Model Number : RULYC015
    Certification : CE, AISC, SGS, BV, ISO, GB
    Price : USD19-USD39 Per Square Meter
    Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
    Supply Ability : 20,000 square meters or 1,500 tons per month
    Delivery Time : 20 days
    • Product Details
    • Company Profile

    Industrial Steel Structure Fabrication Prefabricated Portal Steel Structure

    Prefabricated Metal Steel Structure Warehouse Portal Steel Structure Building Steel Structure Industrial Park Workshop

    Project description:

    The steel structure industrial park workshop is a large-scale manufacturing facility designed specifically for the production and assembly of steel structures. The workshop is typically a spacious and well-organized space, equipped with advanced machinery and tools to facilitate the fabrication process.


    The workshop consists of several areas dedicated to different stages of production. The raw materials area is where steel beams, plates, and other necessary components are stored and prepared for fabrication. This area is equipped with cranes and forklifts to handle heavy materials and transport them to the appropriate workstations.


    The fabrication area is where the steel components are cut, shaped, and welded according to the design specifications. Skilled workers use various cutting and welding machines, such as plasma cutters and arc welders, to shape the steel and join the components together. This area is equipped with ventilation systems to ensure a safe working environment.


    Once the components are fabricated, they move to the assembly area. Here, workers assemble the steel structures using bolts, nuts, and other fasteners. The assembly area is designed to accommodate large structures, and it may have overhead cranes or gantry systems to assist in lifting and positioning the components.


    Quality control is an essential part of the workshop. Dedicated inspectors conduct inspections at different stages of production to ensure that the steel structures meet the required standards and specifications. This may involve non-destructive testing, dimensional checks, and visual inspections.


    The workshop may also have additional facilities, such as a painting booth or surface treatment area, where steel structures are coated with protective finishes to enhance their durability and resistance to corrosion.


    Overall, the steel structure industrial park workshop is a crucial component of the steel construction industry, providing a controlled and efficient environment for the fabrication and assembly of high-quality steel structures.


    ItemsSpecification
    Main steel frameColumeQ235,Q355 welded H section steel
    BeamQ235,Q355 welded H section steel

    Secondary frame

    PurlinQ235 C and Z purlin
    Knee braceQ235 angle steel
    Tie rodQ235 circular steel pipe
    BraceA235 round bar
    Vertical and horizontal supportQ235 angle steel, round bar or steel pipe
    Maintenance systemRoof panelEPS sandwich panel/glass fiber sandwich panel/rock wool sandwich panel/Pu sandwich panel/steel sheet
    Wall panelSandwich panel/corrugated steel sheet

    Accessories

    WindowAluminium alloy window/PVC window/sandwich panel window
    DoorSliding sandwich panel door/rolling metal door/personal door
    RainspoutPVC
    Live load on roofIn 120kg/sqm(color steel panel surrounded)
    Wind resistance grade12 grades
    Earthquake-resistance8 grades
    Structure usageUp to 50 years
    Finishing optionsVast array of colors and textures available
    Paint optionsAlkyd paiting, two primary paiting, two finish paiting(Gray paint, red paint, white paint, epoxy zinc etc.) or galvanized

    Company profile:

    Qingdao Ruly Steel Engineering Co., Ltd is a professional steel structure design, research, fabrication and construction company, located in Qingdao, China. Our company's steel structure processing plant now covers an area of 35, 000 square meters, plant20, 000 square meters. More than 100 employees. The monthly production capacity for steel structure is more than 2000 Tons.

    We could contract the projects such as prefabricated steel structure warehouse, workshop, storage sheds, garage, hangar, chicken shed, car parking, showroom, office buildings, gym, dormitory building, high rise steel residence buildings, oli&gas project, power station, infrastructure buildings, etc.

    At present, Our products have been exported to Southeast Asia, South America, Middle East and Africa, Australia, etc. In order to serve better for the exported project, we get certification of AWS D1.1, CE(EN 1090-1: 2009+A1: 2011), ISO 14001, ISO9001, ISO45001, AS/NZS 1554, SGS and BV Certification.

    We provide one-stop service for steel structure project, just tell us your requirement, and we will give you what you need.



    Processing and fabrication:


    Our service:

    Our certificate:

    Packing and loading:

    All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40'HQ.

    All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.


    Why us:

    1. Professional design team, we could design the drawing as your requirement or calculate the steel quantity based on your drawing.

    2. Skilled fabrication team and advanced equipment. We make the independent production schedule to each project.

    3. One-stop service: We have completed lots such kinds of projects, we could provide the integrated proposal for your project.

    4. Professional QC team will guarantee that we will provide the production and service as your request.

    5. After sales service: If it has any questions that need us to do in your process of using, such as the maintain of outside insulation and steel components, just tell us , we will try to provide the service as well as we can.

    How to quote:

    The following questions we need to know before offering the quotation. Just feel free to fill in what you know.


    1Location (where will it be built?)_____country, area
    2Size: length*width*height_____mm*_____mm*_____mm
    3wind load (max. wind speed)_____kn/m2, _____km/h, _____m/s
    4snow load (max. snow height)_____kn/m2, _____mm
    5anti-earthquake_____level
    6brickwall needed or notIf yes, 1.2m high or 1.5m high
    7thermal insulationIf yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much
    lower than that of the former
    8door quantity & size_____units, _____(width)mm*_____(height)mm
    9window quanity & size_____units, _____(width)mm*_____(height)mm
    10crane needed or notIf yes, _____units, max. lifting weight____tons; max. lifting height _____m

    Quality Industrial Steel Structure Fabrication Prefabricated Portal Steel Structure for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Qingdao Ruly Steel Engineering Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)