Sign In | Join Free | My himfr.com
Home > Steel Structure Warehouse >

Large Span Prefabricated Steel Structure Rice Storage Warehouse

Qingdao Ruly Steel Engineering Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Large Span Prefabricated Steel Structure Rice Storage Warehouse from wholesalers
     
    Buy cheap Large Span Prefabricated Steel Structure Rice Storage Warehouse from wholesalers
    • Buy cheap Large Span Prefabricated Steel Structure Rice Storage Warehouse from wholesalers
    • Buy cheap Large Span Prefabricated Steel Structure Rice Storage Warehouse from wholesalers
    • Buy cheap Large Span Prefabricated Steel Structure Rice Storage Warehouse from wholesalers
    • Buy cheap Large Span Prefabricated Steel Structure Rice Storage Warehouse from wholesalers

    Large Span Prefabricated Steel Structure Rice Storage Warehouse

    Ask Lasest Price
    Brand Name : Ruly Steel
    Model Number : Ruly0427
    Certification : SGS, BV, ISO
    Price : USD29-USD99 Per Square Meter
    Payment Terms : L/C, T/T, Western Union
    Supply Ability : 20000 Square Meter Per Month
    Delivery Time : 30 Days
    • Product Details
    • Company Profile

    Large Span Prefabricated Steel Structure Rice Storage Warehouse

    Prefabricated Steel Structure Rice Storage Warehouse/Large-Span Steel Structure Building


    Steel structure building is made from welding H section steel as column and beam, some of them has crane beam, it's made from H steel beam too.Galvanized C ,Z section steel as wall purlin and roof purlin, Its wall and roof are made of metal steel sheet or sandwich panel. The door is electric shutter door or flat open door. Window is pvc or aluminum window. With the extensiveuse of steel structure,its advantages are increasingly significant compared with traditional building.

    Qingdao Ruly Steel Engineering Co.,Ltd is a professional steel structure fabrication and construction company for light and heavy steel structure Design, Manufacture & Installation.


    Project details:

    NamePrefab Steel Structure Warehouse Structural Steel Frame Buildings
    Structure Typeportal frame, single ridge, single span
    Length133m
    Width67m
    Eave Height11.5m
    Roof Slope10%
    Gable Wall Column Spacing7m
    Roof

    75 mm Glass wool sandwich panel


    Wall75mm Glass wool sandwich panel
    DoorSliding door
    WindowRibbon Skylight
    Height difference between indoor and outdoor300mm


    Specification of steel structure material:

    Steel FrameH section steelQ235/Q355 steel 8mm/10mm
    WeldingAutomatic submerged arc welding
    Rust removalSand blasting
    Surface finishAlkyd paint or galvanized
    Intensive boltM20,Grade 10.9
    Supporting SystemAngle braceL50x4,Steel Q235, processed and painted
    Horizontal braceΦ20, Steel Q235, processed and painted
    Column branceΦ20, Steel Q235, processed and painted
    Tie rodΦ89*3, Steel Q235, processed and painted
    Ordinary boltM12 Galvanized bolt
    RoofPurlinC160*60*2.5,Steel Q235, galvanized and painted
    Roof panelSandwich panel or corrugated steel sheet
    Sky light6mm thick PVC
    AccessoriesGlass cement, self-tapping screws, etc.
    Edge cover0.4mm steel sheet profile trimming
    Gutter0.4mm thick sheet steel profile or galvanized sheet
    Down pieΦ110PVC
    WallsPurlinC160*60*2.5,Steel Q235, painted
    WallSandwich panel or corrugated steel plate
    AccessoriesGlass cement, self-tapping screws, etc.
    Edge cover0.4mm steel sheet profile trimming
    VentilationVentilation ball
    Doors & windowsRolling door/sliding door PVC/alu/steel/window

    Design

    Precautions for fixed packaging, loading and unloading, transportation and unloading of steel structure warehouse:
    (1) Large lifting tools must have special personnel responsible for them, use them appropriately, and strictly observe
    Lifting rules to prevent vibration, impact, deformation or damage during the lifting process.
    (2) Special personnel must supervise when loading the truck, check the number and packaging of the truck,
    Securely fix and increase the degree of looseness of necessary binding components to prevent loss.
    (3) Maintain stability during transportation. When transporting vehicles, in the transportation of long, wide, and high objects, well-trained pilots must be accompanied by responsible personnel and place marks on the vehicles.
    (4) Rough handling is not allowed. The handling, weight, and size of the loading and unloading personnel should be familiar with the parts, and check the slings and rigging of the harness to prevent accidents.
    (5) Members go to the construction site and organize unloading and stacking areas in time.
    (6) When handling parts of a crawler crane, attention should be paid to the surrounding terrain and air conditions to prevent the crawler crane from overturning and component collision.
    Quality Large Span Prefabricated Steel Structure Rice Storage Warehouse for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Qingdao Ruly Steel Engineering Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)