Sign In | Join Free | My himfr.com
Home > Steel Structure Warehouse >

Pre Engineered Steel Structure Warehouse Buildings With Double Spans

Qingdao Ruly Steel Engineering Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Pre Engineered Steel Structure Warehouse Buildings With Double Spans from wholesalers
     
    Buy cheap Pre Engineered Steel Structure Warehouse Buildings With Double Spans from wholesalers
    • Buy cheap Pre Engineered Steel Structure Warehouse Buildings With Double Spans from wholesalers
    • Buy cheap Pre Engineered Steel Structure Warehouse Buildings With Double Spans from wholesalers

    Pre Engineered Steel Structure Warehouse Buildings With Double Spans

    Ask Lasest Price
    Brand Name : Ruly Steel
    Model Number : Ruly0190
    Certification : SGS, BV, ISO
    Price : USD29-USD99 Per Square Meter
    Payment Terms : L/C, T/T, Western Union
    Supply Ability : 20000 Square Meter Per Month
    Delivery Time : 30 Days
    • Product Details
    • Company Profile

    Pre Engineered Steel Structure Warehouse Buildings With Double Spans


    Pre Engineered Steel Structures Warehouse Buildings With Double Spans


    Project Information:

    Pre Engineered Steel Structures Warehouse Buildings With Double Spans. This steel building structure system is formed by the main framework through linking up the H beam,Column, purlin.Roof and wall using a variety of panels together with other components such as windows and doors.This steel buildings were designed, fabricated and installed by Qingdao Ruly Steel who are professional and practical in designing, processing and installing.You may give us your own drawings to enable us construct as per your request or you might just give us your ideas. we could design the project as per your ideas. Welcometo contact us for anything you need.


    Specification of steel structure material:

    Steel FrameH section steelQ235/Q345 steel 8mm/10mm
    WeldingAutomatic submerged arc welding
    Rust removalSand blasting
    Surface finishAlkyd paint or galvanized
    Intensive boltM20,Grade 10.9
    Supporting SystemAngle braceL50x4,Steel Q235, processed and painted
    Horizontal braceΦ20, Steel Q235, processed and painted
    Column branceΦ20, Steel Q235, processed and painted
    Tie rodΦ89*3, Steel Q235, processed and painted
    Ordinary boltM12 Galvanized bolt
    RoofPurlinC160*60*2.5,Steel Q235, galvanized and painted
    Roof panelSandwich panel or corrugated steel sheet
    Sky light6mm thick PVC
    AccessoriesGlass cement, self-tapping screws, etc.
    Edge cover0.4mm steel sheet profile trimming
    Gutter0.4mm thick sheet steel profile or galvanized sheet
    Down pieΦ110PVC
    WallsPurlinC160*60*2.5,Steel Q235, painted
    WallSandwich panel or corrugated steel plate
    AccessoriesGlass cement, self-tapping screws, etc.
    Edge cover0.4mm steel sheet profile trimming
    VentilationVentilation ball
    Doors & windowsRolling door/sliding door PVC/alu/steel/window

    Our steel structure fabrication factory:

    The floor space of our steel structre fabrication factory is 35,000㎡, and the workshop area is 20000㎡. We own three light/heavy H steel production lines, BOX production lines, C/Z purlin production lines and various types of profiling steel sheet machines with advanced equipment such as plasma cutting machine.

    Advantages of prefabricated steel structure buildings:

    1High strength and light weightAlthough the density of steel is larger than that of other building materials, its strength is very high. Under the same force, the steel structure has a small weight and can be made into a structure with a large span.
    2Good plasticity and good toughnessThe plasticity of the steel is good, and the structure will not suddenly break due to accidental overload or partial overload. The toughness of the steel is good, making the structure more adaptable to dynamic loads.
    3High degree of industrialization in productionThe steel structure is mainly produced in a specialized metal structure factory, so the production is simple and the precision is high.
    4Simple construction and short construction periodAll components are prefabricated at the factory, and the site is simply assembled, which greatly shortens the construction period.
    5Wind resistance and structural stabilitySteel structure construction with light weight, high strength, good overall rigidity and strong deformation ability
    6Saving construction costsThe steel structure has light weight, reduces the basic cost, and has a fast construction speed. It can be completed and put into operation as soon as possible, and the comprehensive economic benefits are much better than the concrete structure.
    7RecyclableSteel can be recycled, less environmentally polluted when constructed and removed

    Packing and transport:

    All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.

    All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.

    Quality Pre Engineered Steel Structure Warehouse Buildings With Double Spans for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Qingdao Ruly Steel Engineering Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)