Sign In | Join Free | My himfr.com
Home > Steel Structure Construction >

Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface

Qingdao Ruly Steel Engineering Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface from wholesalers
     
    Buy cheap Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface from wholesalers
    • Buy cheap Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface from wholesalers
    • Buy cheap Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface from wholesalers
    • Buy cheap Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface from wholesalers

    Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface

    Ask Lasest Price
    Brand Name : Ruly Steel
    Model Number : Ruly0225
    Certification : SGS, BV, ISO
    Price :
    Payment Terms : L/C, T/T, Western Union
    Supply Ability : 20000 Square Meter Per Month
    Delivery Time : 30 Days
    • Product Details
    • Company Profile

    Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface


    Metal Frame Construction / Industrial Steel Structures / Structural Steel Frame Construction


    Metal Frame Construction / Industrial Steel Structures / Structural Steel Frame Construction. We could contract the projects such as prefabricated steel structure warehouse, workshop, storage sheds, garage, hangar, chicken shed, car parking, showroom, office buildings, gym, dormitory building, high rise steel residence buildings, oli&gas project, power station, infrastructure buildings, etc. The major factors that effect the budget of prefabricated steel structure buildings are as below:


    1. The height of the building, according to actual needs, increases the construction cost by 2% to 3% for every 10cm increase.


    2. With or without crane tonnage, the choice of crane tonnage is also a big deal. If the tonnage selected is too large, it will cause waste of equipment, which is too small to meet the construction needs. Of course the price is different.

    3. The protection structure, this is also the cost to consider, such as doors, windows, exterior walls and so on.

    4. The type of the design structure of the factory building in the location, the building time, the use and other related factors.

    5. The size of the construction area is the most essential influence. The large area must have a large amount of steel, and the cost of the steel structure factory building is relatively high. The width determines the area, and of course, it is also closely related to the structure of the plant design.

    6. The length of the steel structure span, generally speaking, the larger the span, the lower the cost. Of course, the span is arranged according to its own needs, the design is different, the span is also different, of course, the requirements of the column distance are also very different.


    7, the amount of steel required, the steel structure factory building cost has the greatest impact on the amount of steel. In addition to the source of the steel, the imported ones are also different from the domestic ones, and the color steel plates or sandwich plates are also different. On the same material, the area that has the greatest influence on the amount of steel is its area. The size of the building area determines the amount of steel used. Of course, the design of the structure is also within the scope of influence.


    Material list and technical parameters:

    Item nameSpecificationMaterial ParameterTechnical Treatment
    ColumnH-section steelQ235B,Q345BPaint or Hot dip galvanized
    BeamH-section steelQ235B,Q345BPaint or Hot dip galvanized
    BracingSteel rod,Steel pipe,Angle steelQ235B,Q345B
    PurlingC or Z shape, purling Thickness:1.8mm~3.0mmQ235B,Q346BHot dip galvanized
    Wall and roof panelEPS,Rock wool,Pu,Glass wool Sandwich panel or Single sheet.Steel T=0.426~0.8mm,insulation T=50~150mmAlu-zinc 150g, Fluorocarbon paint
    DoorSliding or rolling doorSteel or Aluminum sheet,T=1.0~1.5mmPaint or Hot dip galvanized
    Windowalloy-Glass,Aluminium alloy-shutterT=1.0~2.0mmAlloy
    Lighting panelFRP, T=1.5mm or T=1.8mmCoefficient of thermal expansion:2.2x10-5/cm/cm/℃Light transmittance 85%
    VentilatorTurbine ventilator, and electric typeSteel,stainless steel,PCPaint or Hot dip galvanized,304
    GutterGalvanized or stainless steel plateT=2.0mmHot dip galvanized,304
    DownpipePVC pipe,Color steel pipe T=0.5mmΦ110,160,200Paint
    BoltOrdinary, high strength10.9S,4.8sHot dip galvanized
    Anchor boltSteel rod M24,M27 M30Q235B


    Designing:

    We have a dedicated steel structure engineering design department and research and development department, and established an independent and complete steel structure engineering design, optimization and deepening design system. Establishing engineering materials than building materials, we not only control the reliability and economy of the structure, but also the categories, performance, selection and combination of traditional enclosing materials and new maintenance materials. Our design is not only more applicable, safer, more economical, but also rich in architectural beauty.



    How to install:

    We will provide installation drawing for each project to guide installation. If you need, we could dispatch our engineer to construction site to guide installation or we install it directly.


    How to quote:

    The following question we need to know before making the price. Just feel free to fill what you know.

    1

    Location (where will be built?)

    _____country, area

    2

    Size: length*width*height

    _____mm*_____mm*_____mm

    3

    wind load (max. wind speed)

    _____kn/m2, _____km/h, _____m/s

    4

    snow load (max. snow height)

    _____kn/m2, _____mm

    5

    anti-earthquake

    _____level

    6

    brickwall needed or not

    If yes, 1.2m high or 1.5m high

    7

    thermal insulation

    If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much
    lower than that of the former

    8

    door quantity & size

    _____units, _____(width)mm*_____(height)mm

    9

    window quanity & size

    _____units, _____(width)mm*_____(height)mm

    10

    crane needed or not

    If yes, _____units, max. lifting weight____tons; max. lifting height _____m

    Quality Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Qingdao Ruly Steel Engineering Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)