Sign In | Join Free | My himfr.com
Home > PEB Steel Buildings >

EPS Wall Q235B Pre Engineered PEB Steel Buildings

Qingdao Ruly Steel Engineering Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap EPS Wall Q235B Pre Engineered PEB Steel Buildings from wholesalers
     
    Buy cheap EPS Wall Q235B Pre Engineered PEB Steel Buildings from wholesalers
    • Buy cheap EPS Wall Q235B Pre Engineered PEB Steel Buildings from wholesalers
    • Buy cheap EPS Wall Q235B Pre Engineered PEB Steel Buildings from wholesalers
    • Buy cheap EPS Wall Q235B Pre Engineered PEB Steel Buildings from wholesalers
    • Buy cheap EPS Wall Q235B Pre Engineered PEB Steel Buildings from wholesalers

    EPS Wall Q235B Pre Engineered PEB Steel Buildings

    Ask Lasest Price
    Brand Name : Ruly Steel
    Model Number : Ruly0234
    Certification : SGS, ,ISO, BV
    Price :
    Payment Terms : L/C, T/T, Western Union
    Supply Ability : 20000 Square Meter Per Month
    Delivery Time : 30 Days
    • Product Details
    • Company Profile

    EPS Wall Q235B Pre Engineered PEB Steel Buildings

    Pre engineered Steel Structure Buildings Fabrication And Construction


    ADVANTAGE OF PRE ENGINEERED STEEL STRUCTURE BUILDINGS:

    The construction mode of Pre engineered Steel Structure Buildings is design → factory manufacturing → on-site installation, compared with concrete buildings, it has below advantages:


    1Steel structural material has high strength and light weightThe steel structure has high strength. Compared with the concrete structure, the steel structure beam and the column cross-sectional area are small, which can increase the effective use area. Generally, the cross-sectional area of the high-rise steel structure column accounts for about 3% of the building area, and the cross-sectional area of the high-rise concrete structure accounts for 7%-9% of the building area.
    2Steel structure construction speed is fastMost of the steel structure is produced in the factory and transported to the site for integral assembly by welding or bolting. It can be used all day, because the steel structure itself can be used as a load-bearing structure for the construction load to reduce the formwork during construction, thus not only reducing costs, but also greatly speeding up Construction speed. The construction speed of the steel structure is about 1.5 times that of the concrete structure.
    3Convenient pipeline layoutIn the structural space of the steel structure, the truss type member or the member having the cavity can be used, so that the arrangement of the pipeline is convenient, and the replacement and repair of the pipeline is convenient. However, if a concrete structure is used, the beam should not be opened, and the pipe generally passes under the beam, thereby occupying a certain space. In the case of the same floor height, the floor height of the steel structure can be smaller than the floor height of the concrete structure, which can reduce the area of the outer wall.
    4The steel construction environment is less pollutedWhen steel structure is constructed, sand, stone, soil, cement and other materials are rarely used, and pollution problems such as dust flying, waste accumulation and noise are avoided from the root wood.
    5Steel structure construction conforms to sustainable development policyThe steel structure industry is a green-bag environmental protection construction industry. Its utilization of resources and energy is relatively reasonable, and has little damage to the environment.

    MATERIAL LIST OF PRE ENGINEERED STEEL STRUCTURE BUILDINGS:

    Steel FrameH section steelQ235/Q345 steel plate thickness: 8-30mm
    WeldingAutomatic submerged arc welding
    Rust removalSand blasting
    Surface finishAlkyd paint or galvanized
    Intensive boltM20,Grade 10.9
    Supporting SystemAngle braceL50x4,Steel Q235, processed and painted
    Horizontal braceΦ20, Steel Q235, processed and painted
    Column branceΦ20, Steel Q235, processed and painted
    Tie rodΦ89*3, Steel Q235, processed and painted
    Ordinary boltM12 Galvanized bolt
    RoofPurlinC160*60*2.5,Steel Q235, galvanized and painted
    Roof panelSandwich panel or corrugated steel sheet
    Sky light6mm thick PVC
    AccessoriesGlass cement, self-tapping screws, etc.
    Edge cover0.4mm steel sheet profile trimming
    Gutter0.4mm thick sheet steel profile or galvanized sheet
    Down pieΦ110PVC
    WallsPurlinC160*60*2.5,Steel Q235, painted
    WallSandwich panel or corrugated steel plate
    AccessoriesGlass cement, self-tapping screws, etc.
    Edge cover0.4mm steel sheet profile trimming
    VentilationVentilation ball
    Doors & windowsRolling door/sliding door PVC/alu/steel/window

    OUR SERVICE:

    1. Structural steel fabrication, painting , galvanizing , pre-assembly

    2. Designing, fabrication and installation for Prefabricated steel structure building.

    3. Deepen or design the fabrication drawing or shop drawing based on your architectural drawing and construction drawing

    4. Engineering consulting service


    QUALITY CONTROL FOR STEEL STRUCTURE FABRICAITON:


    100% testing dimension tolerance <1mm
    20% sample welding line ultrasonic testing, no fault, full penetration.
    20% magnetic powder testing, no bubble, no defect, Smooth and Full
    Supply third-party inspection assistance.

    Quality EPS Wall Q235B Pre Engineered PEB Steel Buildings for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Qingdao Ruly Steel Engineering Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)