Sign In | Join Free | My himfr.com
Home > Steel Structure Warehouse >

PU Panel Large Span Logistics Steel Structure Warehouse

Qingdao Ruly Steel Engineering Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap PU Panel Large Span Logistics Steel Structure Warehouse from wholesalers
     
    Buy cheap PU Panel Large Span Logistics Steel Structure Warehouse from wholesalers
    • Buy cheap PU Panel Large Span Logistics Steel Structure Warehouse from wholesalers
    • Buy cheap PU Panel Large Span Logistics Steel Structure Warehouse from wholesalers
    • Buy cheap PU Panel Large Span Logistics Steel Structure Warehouse from wholesalers
    • Buy cheap PU Panel Large Span Logistics Steel Structure Warehouse from wholesalers

    PU Panel Large Span Logistics Steel Structure Warehouse

    Ask Lasest Price
    Brand Name : Ruly Steel
    Model Number : Ruly0238
    Certification : SGS, BV, ISO
    Payment Terms : L/C, T/T, Western Union
    Supply Ability : 20000 Square Meter Per Month
    Delivery Time : 30 Days
    • Product Details
    • Company Profile

    PU Panel Large Span Logistics Steel Structure Warehouse

    Large Span Logistics Steel Structure Warehouse Design Fabrication Construction


    Project information: We completed the EPC contract for this International Logistics Warehouse in 2013. This logistics warehouse is used as internation cargos logistics in Qingdao Port. It includes 5 prefab steel structure warehouses, the size of each warehouse is 200m Length×60m Width×12m Height. All the steel structure components are fabricated in our factory.


    Our workscope: Make project proposal, Design all the drawings, Fabrication and provide all the components, Construction.


    Total building area: 60,000m2.

    Qingdao Ruly Steel Engineering Co.,Ltd is a professional steel structure fabrication and construction company for light and heavy steel structure project. Our service include design, fabrication for all the steel structure components and insullation panel, installation on site.


    Material list and technical parameters:

    No.ItemDetails of steel structure warehouse buildings or steel frame
    1MaterialMaterialcarbon structural steel
    2ProduceLead timeNormallly 45days after down payment, also according to quantity.
    3QualityCertificationQuality certificate from factory, the third party by client request.
    4DimensionsLengthH beam: 4000-15000mm
    5Thickness:web plate: 6-32mm
    6wing plate: 6-40mm
    7Height200-1200mm
    8ColorAccording to customers
    9SizeMOQ is 1000 m2, width * length * eave height,
    10Main componentsBaseCement and steel foundation bolts
    11Main frameH Steel beam, Q235 Q345 steel H beam and columns, painted or galvanized, box steel, galvanized C section or steel pipe
    12Secondary frame :galvanized C or Z purlin , steel bracing , tie bar , knee brace ,flashing etc.
    13MaterialQ235B, Q345B or others as buyers' requests, like: ASTM, BSEN, DIN, IPE,AISI,JIS,
    14PurlinC or Z purlin: Size from C120~C320, Z100~Z20
    15ColumnX-type, tree type ,lattice, Cross, Box etc.
    16BoltPlain bolt and High-strength bolt
    17Roof & wallPU sandwich panel, Rockwool sandwich panel or Corrugated steel sheet
    18Canopysteel sheet, PU sandwich panel, Rockwool sandwich panel
    19DoorSliding or rolling door
    20WindowAluminium alloy window
    21SurfaceTwo lays of rust-proof painting or Hot Dip Galvanized
    22Sheet0.5mm or 0.6mm galvanized sheet
    23AccessoriesSemi-transparent skylight belts, Ventilators,down pipe, Galvanized gutter, Trim, flashing, etc
    24Finishing optionsVast array of colors and textures available, Alkyd painting, two primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.). Or Galvanized.
    25Usages1. Steel workshop, steel warehouse, steel structure plant
    262. Steel web frame structure
    273. Steel H-column and steel H-beam
    284. Portal frame products
    295. High rise building project
    306. Others steel structure buildings
    31Packing1. Container 20 feet: Inside: 5.69m x 2.34m x 2.18m, Gross weight: 17.5 ton, volume is 24-26m3.
    2. Container of 40 feet: Inside: 11.8m x 2.34m x 2.18m, Gross weight: 22 ton, volume is 54m3.
    3. HC container: Inside: 13.58m x 2.34m x 2.71m, Gross weight: 29 ton, volume is 68m3.
    4. All of the steel columns &beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
    32
    33
    34
    35DrawingAccording to drawings or steel structure design, according to customer's requirement.


    Our service:

    1. Structural steel fabrication, painting , galvanizing , pre-assembly

    2. Designing, fabrication and installation for Prefabricated steel structure building.

    3. Deepen or design the fabrication drawing or shop drawing based on your architectural drawing and construction drawing

    4. Engineering consulting service

    Our steel structure production line:

    The floor space of our steel structre fabrication factory is 35,000㎡, and the workshop area is 20000㎡. We own three light/heavy H steel production lines, BOX production lines, C/Z purlin production lines and various types of profiling steel sheet machines with advanced equipment such as plasma cutting machine.


    Advantages of prefabricated steel structure buildings:

    No.High strength and light weightAlthough the density of steel is larger than that of other building materials, its strength is very high. Under the same force, the steel structure has a small weight and can be made into a structure with a large span.
    2Good plasticity and good toughnessThe plasticity of the steel is good, and the structure will not suddenly break due to accidental overload or partial overload. The toughness of the steel is good, making the structure more adaptable to dynamic loads.
    3High degree of industrialization in productionThe steel structure is mainly produced in a specialized metal structure factory, so the production is simple and the precision is high.
    4Simple construction and short construction periodAll components are prefabricated at the factory, and the site is simply assembled, which greatly shortens the construction period.
    5Wind resistance and structural stabilitySteel structure construction with light weight, high strength, good overall rigidity and strong deformation ability
    6Saving construction costsThe steel structure has light weight, reduces the basic cost, and has a fast construction speed. It can be completed and put into operation as soon as possible, and the comprehensive economic benefits are much better than the concrete structure.
    7RecyclableSteel can be recycled, less environmentally polluted when constructed and removed

    Quality PU Panel Large Span Logistics Steel Structure Warehouse for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Qingdao Ruly Steel Engineering Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)