Sign In | Join Free | My himfr.com
Home > Steel Structure Warehouse >

DIN Large Span Metal Structure Buildings With Mezzanine Steel Factory Buildings

Qingdao Ruly Steel Engineering Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap DIN Large Span Metal Structure Buildings With Mezzanine Steel Factory Buildings from wholesalers
     
    Buy cheap DIN Large Span Metal Structure Buildings With Mezzanine Steel Factory Buildings from wholesalers
    • Buy cheap DIN Large Span Metal Structure Buildings With Mezzanine Steel Factory Buildings from wholesalers
    • Buy cheap DIN Large Span Metal Structure Buildings With Mezzanine Steel Factory Buildings from wholesalers
    • Buy cheap DIN Large Span Metal Structure Buildings With Mezzanine Steel Factory Buildings from wholesalers
    • Buy cheap DIN Large Span Metal Structure Buildings With Mezzanine Steel Factory Buildings from wholesalers

    DIN Large Span Metal Structure Buildings With Mezzanine Steel Factory Buildings

    Ask Lasest Price
    Brand Name : Ruly Steel
    Model Number : Ruly0266
    Certification : SGS, BV, ISO
    Price : USD29-USD99 Per Square Meter
    Payment Terms : L/C, T/T, Western Union
    Supply Ability : 20000 Square Meter Per Month
    Delivery Time : 30 Days
    • Product Details
    • Company Profile

    DIN Large Span Metal Structure Buildings With Mezzanine Steel Factory Buildings


    Large Span Steel Structure Buildings With Mezzanine Steel Factory Buildings


    Project introduction:

    This is a Large Span Steel Structure Buildings With Mezzanine Steel Factory Buildings. It is used to produce and store biological product. It has 4 spans. Each span is 28m width. It also has mezzanine in side. Steel buildings are becoming increasingly popular in the construction industry. Their durability, low cost compared to conventional construction and the fact that they take much less time to build than do other types of new construction. You may find steel buildings used as warehouses, garages, barns and livestock housing, aircraft hangers, factories and even residences. Steel building prices can vary depending on a few different factors, one of the most important being the price of steel at the time.


    Specification of steel structure material:

    Main PartsItem NameSpecification




    Main Steel Frame

    Steel Column
    Q235B, Q345B
    H shape, Box, Steel pipe, Hot rolled sheet

    Steel Beam
    Q235B, Q345B
    H shape, Steel Truss, Hot rolled sheet

    Brace
    Q235B, Q345B
    Steel rod, Steel pipe, Angle steel
    Roof PurlinC or Z shape, Steel purlin



    Supporting System

    Wall Purlin
    Q235B, Q345B
    C or Z shape, Steel purlin
    RoofSingle colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc.,
    WallSingle colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc.,





    Accessories
    BoltsOrdinary, High strength
    GutterGalvanized Steel plate, Stainless steel
    WindowsAluminum alloy-Glass, Aluminum alloy-shutter, PVC
    DoorsSliding or Rolling door
    DownpipesPVC pipe, Color steel pipe
    Edge CoverMade of color steel sheet thickness 0.5mm
    VentilatorStainless steel
    CraneCrane in 5 tons to 30 tons

    Advantages of steel structures buildings

    1Steel structural material has high strength and light weightThe steel structure has high strength. Compared with the concrete structure, the steel structure beam and the column cross-sectional area are small, which can increase the effective use area. Generally, the cross-sectional area of the high-rise steel structure column accounts for about 3% of the building area, and the cross-sectional area of the high-rise concrete structure accounts for 7%-9% of the building area.
    2Steel structure construction speed is fastMost of the steel structure is produced in the factory and transported to the site for integral assembly by welding or bolting. It can be used all day, because the steel structure itself can be used as a load-bearing structure for the construction load to reduce the formwork during construction, thus not only reducing costs, but also greatly speeding up Construction speed. The construction speed of the steel structure is about 1.5 times that of the concrete structure.
    3Convenient pipeline layoutIn the structural space of the steel structure, the truss type member or the member having the cavity can be used, so that the arrangement of the pipeline is convenient, and the replacement and repair of the pipeline is convenient. However, if a concrete structure is used, the beam should not be opened, and the pipe generally passes under the beam, thereby occupying a certain space. In the case of the same floor height, the floor height of the steel structure can be smaller than the floor height of the concrete structure, which can reduce the area of the outer wall.
    4The steel construction environment is less pollutedWhen steel structure is constructed, sand, stone, soil, cement and other materials are rarely used, and pollution problems such as dust flying, waste accumulation and noise are avoided from the root wood.
    5Steel structure construction conforms to sustainable development policyThe steel structure industry is a green-bag environmental protection construction industry. Its utilization of resources and energy is relatively reasonable, and has little damage to the environment.


    Our service scope for steel structure project:

    1. Structural steel fabrication, painting , galvanizing , pre-assembly

    2. Designing, fabrication and installation for Prefabricated steel structure building.

    3. Deepen or design the fabrication drawing or shop drawing based on your architectural drawing and construction drawing

    4. Engineering consulting service


    Packing and transport:

    All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.

    All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.

    Quality DIN Large Span Metal Structure Buildings With Mezzanine Steel Factory Buildings for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Qingdao Ruly Steel Engineering Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)